Buying bare land and building your own acreage home is a dream for many Albertans. Financing it works differently from buying an existing home. Lenders see vacant land as riskier, so expect a larger down payment, and plan the build financing from the start.

Why bare land is harder to finance

  • No home to secure the loan, so values are harder to support
  • Fewer buyers for land if the lender ever needs to sell
  • Uncertain future costs for services like a well, septic, power and a driveway

Typical requirements

  • A larger down payment, often 25% to 50% depending on the lender and the land
  • Shorter terms or different products than residential mortgages
  • Good credit and income
  • Clear access and zoning that allows a home. See zoning and road access.

Insured mortgages generally aren’t available for bare land on its own.

Where to look

Credit unions with rural lending experience, some banks and agricultural lenders, depending on the land’s use. A broker can compare options.

Land plus construction together

Many buyers combine the land purchase with a construction mortgage, so the land and build are financed in one plan, with funds released as the home is built. This can make the overall financing easier, since the lender is lending against the future home, not just land. See construction mortgages.

What to check before buying

  1. Zoning allows a home, and any outbuildings you plan
  2. Legal access by a maintained road
  3. Water: likely well depth and quality in the area, from well records and neighbours
  4. Soil and septic suitability: a site assessment can confirm what system is possible
  5. Power and gas: distance to lines and connection costs, which can be significant
  6. Survey and boundaries

An example

Round numbers, for illustration only: a buyer pays $250,000 for 10 acres near Olds. A lender requires 35% down, or $87,500, for a land loan. The buyer plans to build within two years and arranges a construction mortgage that pays out the land loan and funds a $500,000 build in stages.

Budget for services

A well, septic system, power connection and driveway can add tens of thousands of dollars before construction starts. Include them in your plan. See the true cost of owning an acreage.

Taxes and holding costs

While the land sits empty, you’ll pay property taxes and interest. Plan the timing of your build accordingly.

This article is general information, not financial or legal advice. Lender requirements, rates and fees change and depend on your situation.